Tuesday, September 09, 2008

And it only took two years!

The brand spanking new plaza at Van Ness East condominiums.Two years later and Van Ness East's plaza has been unveiled. Well, mostly. The lobby area is now being renovated (good timing guys!) and so the main entrance to the building is still locked -- only one door is open into the building from the plaza. But hey, after two years of negotiating underground walkways and underground traffic and the hundreds if not thousands of times trying to get locked doors to open just to get out of the building, this is exciting stuff. No vehicles on the plaza for the moment either, they will have to keep going around to the back of the building until the lobby is finished.

Check out the curves on that baby!The plaza is on top of a two level garage and I understand that part of the reason for the re-do was to fix structural problems. There used to be a large shallow pool area in the middle of the plaza and I guess that pool water was what would hit me in the head when I was walking through the underground garage. I also heard that another objective was to "round off" the severe, squared-off edges of the roadway. I really didn't have any problems with hard-edged corners so I sure hope the structural difficulties were fixed during the last twenty four months.